April 08, 2008 at 15:52 PM EDT
Dajin Reports Silver Zinc Lead Results at Jackpot

VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 8, 2008) - Dajin Resources Corp. ("Dajin") (TSX VENTURE:DJI) is pleased to report assay results from its 100% owned Jackpot and Hunter V prospects at the Oscar Project located in southeastern British Columbia. The Jackpot prospect is one of several zinc, lead and silver deposits known in the Kootenay Arc belt of similar deposits, several of which have been mined by major companies such as Placer Dome and Teck Cominco Ltd. ("Teck Cominco").

Dajin's drilling penetrated multiple zones of mineralization similar to those encountered in historical drilling on the prospect and in addition found what are believed to be previously unknown mineralized zones. Notably holes JP 07 - 05 and JP 07 - 07 encountered new mineralization in a previously unexplored region. Hole JP 07 - 07 was sited as a 1,200 foot step out to the south and east of drill holes JP 07 - 1B, JP 07 - 02 and JP 07 - 03. This hole encountered what can be interpreted as five separate zones of zinc mineralization Drill hole JP 07 - 05 was sited as a step out from the Hunter V prospect located west-southwest of the Jackpot prospect and was designed as a test for silver mineralization. The Hunter V prospect is a skarn deposit that was previously mined for smelter silica flux and for the 3 to 4 ounces of silver contained in the siliceous skarn. The hole drilled here encountered a narrow interval containing 658 gpt of silver and a previously unreported 12.0 foot thick interval containing 3.3% zinc mineralization.

/T/

--------------------------------------------------------------------------

Zone Interval Elements

Total -----------------------------------------------------

Drill Hole Depth from to length Zn Pb Ag

Number (ft) (ft) (ft) (ft) % % (gpt)

--------------------------------------------------------------------------

JP 07 - 1 B 517 A 82.34 105.00 22.66 1.04 0.05 1.5

including 91.00 97.70 6.10 2.37 0.09 3.1

B 208.00 219.50 11.50 1.75 0.07 1.5

C 288.40 330.80 42.40 1.31 0.44 3.8

including 324.20 327.00 2.80 2.40 3.60 16.7

JP 07 - 02 287 A 9.30 19.20 9.90 0.40 0.02 0.9

B 43.00 50.40 7.40 5.83 0.06 3.2

JP 07 - 03 375 A 29.50 32.00 2.00 8.80 0.21 5.9

B 105.50 112.00 6.50 2.55 0.16 3.9

C 153.35 162.40 9.05 4.39 0.18 3.1

JP 07 - 05 736 A 123.75 124.50 0.75 1.54 0.59 658.0

B 290.40 311.30 20.90 1.96 0.15 2.3

including 290.40 302.40 12.00 3.30 0.07 2.3

including 290.40 297.75 7.35 3.86 0.07 2.1

JP 07 - 07 858 A 128.40 139.00 10.60 0.31 0.01 1.1

B 613.35 623.00 9.65 1.80 0.09 2.5

C 648.00 650.00 2.00 0.59 0.26 6.1

D 688.00 724.65 36.65 2.76 0.14 3.9

including 688.00 694.00 6.00 5.40 0.02 3.6

and 708.00 718.65 10.65 5.73 0.41 7.1

E 773.00 778.00 5.00 3.87 0.74 26.3

F 800.00 800.50 0.50 3.94 0.77 32.5

--------------------------------------------------------------------------

/T/

The Diamond Drill program was designed by Dajin to provide initial confirmation of historical drilling results reported from programs completed over several decades by the New Jersey Zinc Company and Teck Cominco and to locate additional mineralized zones of zinc, lead and silver mineralization. Said historical programs generated a database used by New Jersey Zinc and Teck Cominco to estimate historical and non NI 43-101 compliant resources of three to four million tons of zinc mineralization at the Jackpot prospect.

The Oscar Project is the beneficiary of robust local infrastructure including access by high-speed logging roads leading to the project's location 5 to 10 kilometers from Highway No 6. Electrical power exists alongside Highway No. 6 where the villages of Salmo and Ymir are located in the near vicinity of the Oscar Project. The city of Nelson, 30 km to the north is a source of most supplies needed to support Dajin's exploration work. The project is approximately 50km by paved road from the zinc smelter at Trail, British Columbia.

These drill results clearly confirm the presence of wide spread zinc mineralization similar in grade to that mined from a number of mines in the region. Due to the structural complexity of the region being drilled, Dajin cannot at this time correlate mineralized zones between the drill holes or confidently determine true widths of the sulfide mineralization in each mineralized zone.

With the high zinc prices that are projected to continue into at least the intermediate future, zinc mineralization with the characteristic simple metallurgy common to Kootenay Arc deposits are very attractive. Mineralization available by low cost adit entry and very close to not only the requisite infrastructure but also to smelting capacity is particularly attractive. The fact a deposit of this nature can be quickly explored by drilling to only relatively shallow depths is an additional bonus.

Quality Control and Assurance

A rigorous Quality Control and Assurance program (QC/QA) is in place, including systematic inclusion of standard sample materials. Samples are sent in security sealed sacks to Loring Laboratories Ltd. in Calgary, Alberta. The control samples and duplicate assay results received for the drilling program demonstrated to Dajin that the assay results reported herein are reliable.

David M Jenkins, P.Geo., and V.P. Exploration is designated the qualified person for the Oscar Project.

About Dajin: (www.dajin.ca)

In the Cariboo Mining District Dajin has a Joint Venture agreement with Cariboo Rose Resources Ltd. whereby Dajin can earn a 65% interest in the Cowtrail Property, a 100% interest in 29 mineral claims in the Spanish Mountain region adjacent to Skygold Ventures Ltd.'s recent gold discovery, a 70/30 Joint Venture agreement with Hawthorne Gold Corp. near the Frasergold project where Dajin also owns a 100% interest in 20 additional mineral claims. All properties are being explored for sediment hosted gold deposits.

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
Related Stocks:
Stock Market XML and JSON Data API provided by FinancialContent Services, Inc.
Nasdaq quotes delayed at least 15 minutes, all others at least 20 minutes.
Markets are closed on certain holidays. Stock Market Holiday List
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
Press Release Service provided by PRConnect.
Stock quotes supplied by Six Financial
Postage Rates Bots go here